Guides
Straight-talk explainers on the electrical questions that come up on the Isle of Thanet - EICR timings, EV chargers on the district network, coastal fusebox red flags, LED thermal cutout, solar planning, and district-heating comparison.
The 5-year regulation in plain English, the 28-day tenant-copy rule, and the four-week TDC-remedial window if your report comes back unsatisfactory.
Who the network operator is for the isle, how load-limiting works, and what a shared supply can mean for your driveway install.
Rust bloom, greening on the neutral bar, and burnt-plastic smells. Five visible signals your board is at end-of-life on a north-facing seafront.
Why your new LED downlights "keep dying" after a loft insulation top-up, and the IC-rated cowl-cap fix.
Permitted development for solar in Thanet, conservation areas, listed buildings and the 27 August 2026 rule change.
Where the Thanet Parkway and regen heat-network schemes actually connect, and the electric-heating alternatives - heat pump, storage, direct panel.
Send photos of your board or install location plus a postcode. Same-day fixed price back.